Andrada Mining has reported a significant rise in its direct financial footprint in Namibia, with its contribution increasing by 6% to reach N$775.2 million during the 2026 financial year. This figure, which exceeds £33.17 million, marks a clear step up from the N$731.07 million recorded in the financial year ended February 2025. The growth is primarily attributed to the company’s ongoing expansion of operations at its Uis Mine, which has stimulated wages, royalties, and local procurement activities.
A key driver of this economic boost is the company’s reliance on local businesses for its supply chain. During the financial year, Andrada worked with 241 active suppliers, demonstrating a strong commitment to domestic enterprise. The company noted that 189 of these suppliers, representing 78% of its active vendor base, were Namibian businesses. This extensive local engagement was further amplified by the application of the World Bank’s mining-sector economic multiplier, which allowed the company to estimate that its activities generated an additional N$330.2 million in indirect economic benefits across the broader Namibian economy.
Workforce Development and Employment
The expansion at Uis Mine has also translated into tangible employment opportunities for Namibians. Andrada recruited 126 employees during the year, contributing to the local labor market. Remuneration paid to local staff amounted to approximately N$103.3 million, an increase from the N$100.38 million paid in the previous financial year. This rise in wages reflects both the larger workforce and the company’s efforts to enhance skills development within the sector.
Beyond direct hiring, the company focused on building a pipeline of skilled workers for the future. Andrada appointed 11 graduates from local communities to a 12-month internship programme covering various disciplines. The programme yielded immediate results, with two interns subsequently employed permanently at the Uis Mine processing plant. The remaining participants secured employment with other Namibian employers, thereby spreading the skills acquired during their internship throughout the wider industry.
Chief executive Anthony Viljoen emphasized that the expansion of operations at Uis was creating greater opportunities for employment, local procurement, and skills development. He stated that the company was actively investing in developing a pipeline of Namibian skills for its operations and the wider mining sector, signaling a long-term commitment to human capital growth in the region.
Environmental Stewardship and Water Management
Operational intensity at the Uis Mine has had mixed effects on the company’s environmental metrics. While hazardous waste generation declined by 26% to 42 tonnes from 57 tonnes in the previous year, water usage saw a notable increase. Total water withdrawals rose to 242,537 cubic metres from 201,299 cubic metres in FY2025. Consequently, water withdrawal intensity increased to 0.23 cubic metres per tonne of ore processed, up from 0.21 cubic metres. The company attributed these increases mainly to higher mining and processing activity levels.
To mitigate its impact on local water resources, Andrada reused approximately 101,287 cubic metres of low-quality, non-potable pit water, thereby reducing its reliance on groundwater. The company confirmed the feasibility of additional water supply sources through groundwater monitoring, hydrogeological investigations, numerical modelling, and borehole test-pumping. Andrada is currently engaging with the Ministry of Agriculture, Water and Land Reform on long-term water supply solutions, including desalination, which the company stated could benefit both its operations and surrounding communities.
Tailings Management and Biodiversity
Andrada continues to make progress toward aligning with the Global Industry Standard on Tailings Management (GISTM). The company has completed an options assessment for its proposed co-disposal facility, a critical step in managing mining waste safely. Looking ahead, the company’s FY2027 priorities include appointing an Engineer of Record, conducting further tailings-material characterisation, and advancing detailed design work for these facilities.
Biodiversity management at Uis remains guided by the company’s Biodiversity Action Plan. This framework is supported by ecosystem services and residual impact assessments that inform water stewardship, rehabilitation efforts, and mine closure planning. These measures ensure that environmental considerations remain integral to the mine’s operational strategy as it scales up production.
- Andrada Mining’s direct economic contribution to Namibia rose by 6% to N$775.2 million in the 2026 financial year.
- The company engaged 241 active suppliers, with 78% identified as Namibian businesses, supporting local procurement.
- Total water withdrawals increased to 242,537 cubic metres, attributed to higher mining and processing activity levels.
- Hazardous waste generation declined by 26% to 42 tonnes, despite the overall increase in operational output.
- The company recruited 126 new employees and appointed 11 graduates to a local internship programme during the year.




