Australian-listed exploration company Aldoro Resources has concluded its initial drilling campaign at the Avondschaduw copper-gold prospect in central Namibia. The company reported that the program successfully intersected visible copper-bearing sulphide mineralisation, validating the geophysical models that guided the exploration strategy.
The maiden drilling programme involved two holes, designated AD001 and AD002, which reached total depths of 532.7 metres and 333.5 metres respectively. These targets were identified through induced polarisation (IP) geophysical surveys conducted in 2026. The drilling confirmed the presence of a sulphide-bearing system across a 700-metre strike corridor located northeast of the company’s flagship Kameelburg Project.
Drilling Results and Mineralisation
According to the exploration update issued on Wednesday, both drillholes encountered significant sulphide mineralisation. The intersections included pyrrhotite, pyrite, and chalcopyrite, a mineral known for its copper content. The results align with the target depth zones predicted by the earlier geophysical surveys, suggesting the effectiveness of the company's systematic targeting approach.
Specific findings from the individual holes highlighted distinct geological features. The second drillhole, AD002, intersected a continuous 41.8-metre sulphide-bearing zone between depths of 182.7 metres and 224.5 metres. Meanwhile, the first drillhole, AD001, encountered more than 250 metres of combined hydrothermally altered rock zones.
Executive Chair Quinn Lee stated that the findings support the company’s exploration strategy. He noted that confirming a substantial bedrock sulphide system across the 700-metre corridor demonstrates that geophysical targeting can rapidly unlock new discovery opportunities within the Damara Belt.
Sample Analysis and Next Steps
While the visual observations of drill core are positive, Aldoro cautioned that the findings are preliminary. Laboratory analysis is still required to establish precise copper and gold concentrations and grades. To this end, the company has initiated the sampling process for the first phase of results.
The preparation and dispatch of samples are proceeding as follows:
- Forty-seven half-core samples from the first drillhole (AD001) have been cut, bagged, and delivered to an analytical laboratory in Otjiwarongo for gold and multi-element testing.
- Sixty-two half-core samples from the second drillhole (AD002) have been cut and prepared on site, awaiting dispatch to the laboratory.
- The laboratory results from Avondschaduw will inform the next phase of copper-gold exploration at the prospect.
Relocation to Kameelburg Project
With the completion of the Avondschaduw drilling programme, Aldoro is shifting its operational focus. The company is relocating its drilling equipment to the Kameelburg Project, where it plans to investigate different mineral targets.
At Kameelburg, the focus will be on high-grade niobium mineralisation. The company intends to drill three additional diamond drillholes at this site. This move marks a strategic expansion of Aldoro’s activities in the region, leveraging the infrastructure and geological knowledge gained from the Avondschaduw campaign.
The company expects that the assay results from the current samples will provide critical data to guide future exploration decisions at Avondschaduw, potentially leading to further drilling or resource definition work in the central Namibian region.




