Tuesday, 24 November 2026Editorial policyRSS
The Namibia TimesYour trusted window into Namibian business, economy, and global markets.
Core Energy begins drilling at Namibia’s Barking Gecko uranium prospect

Image: © Mining and Energy

Core Energy begins drilling at Namibia’s Barking Gecko uranium prospect

Key Takeaways

  • Core Energy Minerals initiated mobilization on 2 November 2026 for a maiden drilling program at the Barking Gecko prospect in the Erongo Region.
  • The exploration plan includes 24 drillholes totaling approximately 5,280 metres, with the first phase comprising 12 holes covering 2,640 metres.
  • The company aims to test extensions of known high-grade uranium mineralization and refine geological models under the Nova Joint Venture Project.
  • Core Energy can earn a 51% interest in the project by spending N$23 million on exploration over a specified timeframe.
  • Historical drilling at the site identified significant uranium zones, including an intersection of 21 metres grading 886 parts per million equivalent uranium oxide.

Australian-listed Core Energy Minerals has moved its geological team and drilling contractors to Namibia’s Erongo Region to begin operations at the Barking Gecko uranium prospect. The company confirmed that mobilization activities commenced on 2 November 2026, setting the stage for diamond and reverse circulation drilling to start shortly. This initiative marks the first active exploration phase at the site under the Nova Joint Venture Project, which is held under Exploration Licence EPL3669.

The primary objective of the upcoming campaign is to test for extensions of previously identified high-grade uranium mineralisation. By doing so, the company intends to improve its understanding of the geological structure and assess the resource potential of the prospect. The technical team is currently finalizing site preparations, conducting safety inductions, and setting up drill rigs to ensure the program proceeds according to schedule.

Exploration Scope and Schedule

The planned exploration programme is designed to be comprehensive, covering a total of 24 drillholes that will amount to approximately 5,280 metres of drilling. The work is divided into two distinct phases to manage the logistical and geological assessment requirements effectively. The initial phase will focus on 12 drillholes covering approximately 2,640 metres, which includes four priority holes totaling 880 metres.

A second phase comprising an additional 12 drillholes, also covering approximately 2,640 metres, is scheduled to take place in 2027. This staged approach allows the company to analyze early results and adjust subsequent drilling strategies as necessary. The exploration work will involve geological logging, downhole surveys, and sampling, with all samples submitted to ALS Laboratories for analysis.

Strategic Interest and Financial Commitment

Core Energy Minerals is participating in the Barking Gecko prospect through the Nova Joint Venture agreement, which outlines a clear path for increasing its ownership stake. The company can earn an initial 25% interest in the project by committing to spend N$23 million, equivalent to A$2 million, on exploration activities within an 18-month period. This financial commitment is a critical component of the joint venture structure.

The agreement allows for further expansion of the company’s interest through additional investment. Specifically, Core Energy can earn a further 26% interest by investing an additional A$3 million over the following 24 months. This structure potentially increases the company’s total interest in the project to 51%. The joint venture encompasses Exploration Licences EPL3669 and EPL3670, providing a broad legal framework for the exploration activities.

Historical Context and Technical Targets

The Barking Gecko prospect has a history of exploration that provides a foundation for the current campaign. The site is located adjacent to Bannerman Energy’s Etango Uranium Project and has previously been explored through 82 RC and diamond drillholes. These earlier efforts identified several uranium-bearing zones, demonstrating the area’s potential for high-grade mineralisation.

Tony Greenaway, Managing Director of Core Energy Minerals, highlighted the significance of this milestone for the company’s operations in Namibia. He noted that engaging a drilling contractor and securing mobilization for the first week of November represents a major step forward. The company has identified priority drilling targets in areas where historical exploration intersected thick, high-grade uranium mineralisation that remains open at depth and along strike.

Key details of the exploration strategy and historical data include:

  • Historical drilling identified an intersection of 21 metres grading 886 parts per million equivalent uranium oxide (eU₃O₈).
  • The first phase of drilling will include four priority holes totaling 880 metres out of the initial 2,640 metres.
  • Core Energy aims to extend known mineralisation and test previously unexplored areas to refine geological models.
  • Exploration results will be released to the public as the drilling program progresses.

The company stated that results from the maiden campaign will be released as drilling advances, providing stakeholders with timely updates on the prospect’s potential. This initial phase is critical for validating the geological models and determining the extent of the resource. As the team moves forward, the focus remains on delivering accurate data to support future investment decisions and resource estimation.

Sources & Attributions

This synthesis is compiled from reporting by the following independent publications:

Editorial Notice on Media Use: Pictures on this page illustrate the news and carry their credit where one is held. No copyright ownership is claimed. Our editorial policy says how pictures are chosen.

More in Resources & Energy